Turnkey glass house — exterior view

Price Tiers: Three Scenarios

The turnkey price of a glass house in the Moscow Region in 2026 depends on floor area, configuration, technical specifications, and the choice of contractor. Three baseline scenarios:

ScenarioAreaBudgetWhat's included
Basic40–60 m²RUB 3.5–5.5 millionFrame, glazing, heating, basic electrical
Comfort70–100 m²RUB 6–9 million+ kitchen, bathroom, underfloor heating, climate control
Premium100–160 m²RUB 10–14 million+ Schüco, triple-pane IGUs, smart home, landscaping

Price Breakdown: Line by Line

Let's break down the budget for an 80 m² glass house in the comfort tier (~RUB 7.5 million):

  • Design and engineering: RUB 350,000–650,000 (5–8% of the budget). Includes architectural design, structural calculations, and engineering systems design.
  • Foundation: RUB 400,000–900,000 (6–11%). Pile or slab foundation depending on site geology. Skipping geotechnical surveys is dangerous — settlement of just 2–3 cm will destroy glass connections.
  • Frame (steel + profile): RUB 1,200,000–2,000,000 (16–27%). Load-bearing steel frame plus aluminum façade system. A thermally broken profile is mandatory.
  • Glazing (IGUs): RUB 900,000–1,600,000 (12–20%). Double-chamber IGUs with low-E coating. Laminated roof glass adds 40–60%.
  • Installation: RUB 600,000–1,000,000 (8–13%). Frame assembly, glazing, sealing.
  • Engineering systems: RUB 800,000–1,500,000 (11–20%). Heating (underfloor + convectors), ventilation with heat recovery, electrical, plumbing, drainage.
  • Interior finishes: RUB 400,000–900,000 (5–12%). Flooring, ceiling (where needed), kitchen, bathroom.
  • Other (logistics, temporary structures, contingencies): RUB 300,000–500,000 (4–6%)

Where You Should Not Cut Costs

When trimming the budget, some line items cause problems if you save on them:

  • Design and calculations: without structural calculations for Snow Zone IV loads, the building may not survive winter
  • Geotechnical survey: saving RUB 30,000–50,000 on site investigation can result in uneven settlement
  • Thermally broken profile: non-thermally-broken aluminum makes the building uncomfortable — constant condensation
  • Laminated roof glass: replacing laminated glass with tempered glass violates building codes and creates insurance risks
  • Sealants: cheap acrylic sealant cracks after 3–5 years. Use only silicone or MS polymer.

Comparison with a Conventional House: What Costs More and Why

An 80 m² glass house vs. an 80 m² brick house at the same budget:

  • Glass house: RUB 7–9 million turnkey (RUB 95,000–113,000/m²)
  • Brick house: RUB 5–7 million turnkey (RUB 63,000–88,000/m²)
  • Difference: 20–30% in construction cost

What you get in return: a visual impact and sense of space that brick simply cannot match. Panoramic views, a constant connection with nature, a one-of-a-kind property. In terms of liquidity, a glass house with strong view characteristics sells faster and at a higher price than comparable properties.

Construction Timeline: Realistic Figures

  • Design: 4–10 weeks
  • Fabrication of structures and IGUs: 6–12 weeks
  • Construction and installation: 8–16 weeks (depending on complexity)
  • Engineering systems and finishes: 4–10 weeks
  • Total from contract signing to handover: 5–8 months
QUARTZ ECO delivers turnkey glass houses starting from RUB 3.5 million. Production takes place in Podolsk plus a partner facility in the Kaluga Region. Five-year warranty on the structure.
Glass house details — profile, façade
Get a quote

Get a preliminary cost estimate

Send us the floor area and concept — within two business days we'll prepare a top-level cost estimate broken down by line item.

Get a quote