Price Tiers: Three Scenarios
The turnkey price of a glass house in the Moscow Region in 2026 depends on floor area, configuration, technical specifications, and the choice of contractor. Three baseline scenarios:
| Scenario | Area | Budget | What's included |
|---|---|---|---|
| Basic | 40–60 m² | RUB 3.5–5.5 million | Frame, glazing, heating, basic electrical |
| Comfort | 70–100 m² | RUB 6–9 million | + kitchen, bathroom, underfloor heating, climate control |
| Premium | 100–160 m² | RUB 10–14 million | + Schüco, triple-pane IGUs, smart home, landscaping |
Price Breakdown: Line by Line
Let's break down the budget for an 80 m² glass house in the comfort tier (~RUB 7.5 million):
- Design and engineering: RUB 350,000–650,000 (5–8% of the budget). Includes architectural design, structural calculations, and engineering systems design.
- Foundation: RUB 400,000–900,000 (6–11%). Pile or slab foundation depending on site geology. Skipping geotechnical surveys is dangerous — settlement of just 2–3 cm will destroy glass connections.
- Frame (steel + profile): RUB 1,200,000–2,000,000 (16–27%). Load-bearing steel frame plus aluminum façade system. A thermally broken profile is mandatory.
- Glazing (IGUs): RUB 900,000–1,600,000 (12–20%). Double-chamber IGUs with low-E coating. Laminated roof glass adds 40–60%.
- Installation: RUB 600,000–1,000,000 (8–13%). Frame assembly, glazing, sealing.
- Engineering systems: RUB 800,000–1,500,000 (11–20%). Heating (underfloor + convectors), ventilation with heat recovery, electrical, plumbing, drainage.
- Interior finishes: RUB 400,000–900,000 (5–12%). Flooring, ceiling (where needed), kitchen, bathroom.
- Other (logistics, temporary structures, contingencies): RUB 300,000–500,000 (4–6%)
Where You Should Not Cut Costs
When trimming the budget, some line items cause problems if you save on them:
- Design and calculations: without structural calculations for Snow Zone IV loads, the building may not survive winter
- Geotechnical survey: saving RUB 30,000–50,000 on site investigation can result in uneven settlement
- Thermally broken profile: non-thermally-broken aluminum makes the building uncomfortable — constant condensation
- Laminated roof glass: replacing laminated glass with tempered glass violates building codes and creates insurance risks
- Sealants: cheap acrylic sealant cracks after 3–5 years. Use only silicone or MS polymer.
Comparison with a Conventional House: What Costs More and Why
An 80 m² glass house vs. an 80 m² brick house at the same budget:
- Glass house: RUB 7–9 million turnkey (RUB 95,000–113,000/m²)
- Brick house: RUB 5–7 million turnkey (RUB 63,000–88,000/m²)
- Difference: 20–30% in construction cost
What you get in return: a visual impact and sense of space that brick simply cannot match. Panoramic views, a constant connection with nature, a one-of-a-kind property. In terms of liquidity, a glass house with strong view characteristics sells faster and at a higher price than comparable properties.
Construction Timeline: Realistic Figures
- Design: 4–10 weeks
- Fabrication of structures and IGUs: 6–12 weeks
- Construction and installation: 8–16 weeks (depending on complexity)
- Engineering systems and finishes: 4–10 weeks
- Total from contract signing to handover: 5–8 months