Price Tiers: Three Scenarios

The turnkey price of a glass house in the Moscow Region in 2026 depends on floor area, configuration, technical specifications, and the choice of contractor. Three baseline scenarios:

ScenarioAreaBudgetWhat's included
Basic40–60 m²On requestFrame, glazing, heating, basic electrical
Comfort70–100 m²On request+ kitchen, bathroom, underfloor heating, climate control
Premium100–160 m²On request+ Schüco, triple-pane IGUs, smart home, landscaping

Price Breakdown: Line by Line

Let's break down the budget for an 80 m² glass house in the comfort tier:

  • Design and engineering: 5–8% of the budget. Includes architectural design, structural calculations, and engineering systems design.
  • Foundation: Price on request. Pile or slab foundation depending on site geology. Skipping geotechnical surveys is dangerous — settlement of just 2–3 cm will destroy glass connections.
  • Frame (steel + profile): Price on request. Load-bearing steel frame plus aluminum façade system. A thermally broken profile is mandatory.
  • Glazing (IGUs): Price on request. Double-chamber IGUs with low-E coating. Laminated roof glass adds 40–60%.
  • Installation: Price on request. Frame assembly, glazing, sealing.
  • Engineering systems: Price on request. Heating (underfloor + convectors), ventilation with heat recovery, electrical, plumbing, drainage.
  • Interior finishes: Price on request. Flooring, ceiling (where needed), kitchen, bathroom.
  • Other (logistics, temporary structures, contingencies): Price on request

Where You Should Not Cut Costs

When trimming the budget, some line items cause problems if you save on them:

  • Design and calculations: without structural calculations for Snow Zone IV loads, the building may not survive winter
  • Geotechnical survey: Price on request
  • Thermally broken profile: non-thermally-broken aluminum makes the building uncomfortable — constant condensation
  • Laminated roof glass: replacing laminated glass with tempered glass violates building codes and creates insurance risks
  • Sealants: cheap acrylic sealant cracks after 3–5 years. Use only silicone or MS polymer.

Comparison with a Conventional House: What Costs More and Why

An 80 m² glass house vs. an 80 m² brick house at the same budget:

  • Glass house: price on request
  • Brick house: price on request
  • Difference: 20–30% in construction cost

What you get in return: a visual impact and sense of space that brick simply cannot match. Panoramic views, a constant connection with nature, a one-of-a-kind property. In terms of liquidity, a glass house with strong view characteristics sells faster and at a higher price than comparable properties.

Construction Timeline: Realistic Figures

  • Design: 4–10 weeks
  • Fabrication of structures and IGUs: 6–12 weeks
  • Construction and installation: 8–16 weeks (depending on complexity)
  • Engineering systems and finishes: 4–10 weeks
  • Total from contract signing to handover: 5–8 months
QUARTZ ECO delivers turnkey glass houses starting. Production takes place in Podolsk plus a partner facility in the Kaluga Region. Five-year warranty on the structure.